The logs we cut and trimmed are scheduled to be piled into Bill Lee's trailer tomorrow by Tim Buckingham. From there, they head to Bill O'Brien's sawmill near Port Leyden to be cut into 1" rough sawn boards, which need to be stacked back here on site and covered with a tarp so they dry out slowly over the next year. Tim B is on site this week ripping out stumps and digging out dirt at foundation and a few other heavy duty tasks that require a skid steer.
Not sure what the boards are for, but maybe a pump house, or a shed, or a little camp, or a platform, or fencing, or closing in the crawl space, or steps to the lake. They need to be primed and stained to last outside of course, or sanded to be useful as shelving or paneling inside.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment